REHABILITATION, UPGRADING AND RECONSTRUCTION OF RAILWAY STATIONS ALONG PAN EUROPEAN CORRIDOR X INCLUDING BRANCH XD
DETAILED DESCRIPTION OF THE PROJECT
Global objective
The overall objective of this Operation is improving the overall quality of the services for the passengers and cargo, increasing the technical standards and capacity of the railway stations and overall the interest in travelling and shipping by train.
Specific objectives
The specific objective of this assignment is preparation of high quality technical documentation as follows:
- Preparation of a Study with an assessment of the current situation of the prioritised Railway Stations (6-10) along Pan-European Corridor X and its branch Xd including analysis to identify the needs for rehabilitation and the possibility to implement best EU practices;
- Preparation of Detailed Designs including Bill of Quantities (BoQ) for rehabilitation of each of the prioritised railway stations separately, based on the previously conducted study;
- Preparation of the full Tender Dossier for the Works Contract for Rehabilitation of the prioritised railway stations (6-10), according to the latest PRAG procurement rules and procedures and to the FIDIC red book for implementing the works (conditions of contract);
- Preparation of Specific Terms of Reference and Indicative budget for a Framework Contract for Supervision services of the Works Contract for Rehabilitation of the prioritised railway stations (6-10), according to the latest PRAG procurement rules and procedures;
- Presentation of the prepared documents to the Contracting Authority and the End Beneficiaries.
TYPE OF SERVICES PROVIDED
The Contractor shall provide the following activities:
- Preparation of a Study with an assessment of the current situation of the prioritized Railway Stations (6-10) along Pan-European Corridor X and its branch Xd including an analysis to identify the needs for rehabilitation and the possibility to implement best EU practices.
- Preparation of Detailed Designs, including Bill of Quantities (BoQ) for rehabilitation of each of the (6-10) first ranked railway stations separately based on the previously conducted study.
- Preparation of full Tender Dossier for Works Contract
- Preparation of the Specific Terms of Reference