Name of legal entity |
Country |
Overall project value (EUR) |
No of staff provided |
Name of client |
Origin of funding |
Dates (start/end) |
Name of partners |
GPM Consulting |
Macedonia |
5.000 |
A: 50 MD B: 100% |
ENEL SpA (Italy) |
ENEL SpA (Italy) |
01.08.2007 - 01.09.2007 |
NO PARTNER |
PRICE ANALYSIS OF SUPPLY AND CONSTRUCTION ON THE MACEDONIAN MARKET ABOUT CIVIL WORKS AND ELECTROMECHANICAL HYDROPOWER PLANT
DETAILED DESCRIPTION OF PROJECT
General objective:
Participation on the international tender for concession on rivers “Crna Reka” and “Mala Reka” for construction of HPPs “Cebren and Galiste” and “Boskov Most” HPPs on the principle DBOT (Design, Build, Operate and Transfer)
Price analysis of supply and construction on the Macedonian market about civil works and electromechanical hydropower plant
Specific objectives:
- Estimate, verify and report the current state of market pricing for execution of civil works as listed in the Specification attached to the request.
- Estimated, verify and report the current state of market pricing for supply and erection of electromechanical equipment as listed in the Specification attached to the request.
TYPE OF SERVICES PROVIDED
In the project implementation 2 Experts engaged on the project (Civil and Electrical Engineers)
Provided complete Price analyses of the market prices of the civil works and other civil construction services and electromechanical equipment for the construction of a hydropower plant in Macedonia (Public Private Partnership between ELEM – Producer of electricity and the investor), in particularly:
- Surface works
- Underground works
- Labour
- Materials
- Turbine
- Generator
- Step Up Transformer
- MV Cubicles
- Overhead Crane
- AC Low Voltage
- DC Low Voltage System
- Units Control System
- Protection Control System
- Scada
- Overhead Line
Price analyses with detailed costs breakdown by positions and sub positions in details delivered to the Client.